HYLOW Project. Hydropower converters with very low head differences
Collaborative project under Seventh Framework Programme of the European Union
http://www.hylow.eu/
Employer: Commission of the European Communities
Period of the contract: 2008 year.
Status: completed
Read More
Projects 2008 year
Sofia Metro Extension Project. Construction works. TBM Section
Renovation of the right wing wall of the energy dissipater of Topolnitsa Dam
Scope of construction works:
Restoring of completeness of concrete elements in the construction of the HPP drainage
Formworks
Reinforcement works
Concrete works
Installation of blocks with polymer structure
Drilling and injection works
Hydro installation of right wing wall and wall of HPP drainage
Employer: NEK EAD
Read More
Correction of river bed
Sorry, this entry is only available in Български.Обхват на извършените дейности:
изкопни работи
насипни работи
кофражни работи
армировъчни работи
бетонови работи
отводнителни канавки
дренаж
Период на сключване на договора:
юли 2008 г.
Статус:
Завършен
Read More
Implementation of capping beam for piles at sub-site Metro Station 7 Connection
Repair works of low pressure pipeline in the section from valve blade 1 (situated next to the reservoir of Kamenitsa HPP) to valve blade 2 (situated next to lower water chamber of Kamenitsa HPP)
Scope of works:
Dismantling of existing pipeline
Installation of new fiber glass pipes
Fortification and backfilling of pipeline
Cleaning the construction waste from the route
Employer: Bulgarian Joint-Stock Company Granitoid AD
Read More