Cleaning Zlatna Panega River in the corrected section 550 m from Lukovit Dam Posted on Wednesday August 24th, 2016Saturday September 10th, 2016 by Koki Scope of works: Excavating and removing the material deposited in the corrected areas using mechanization in difficult conditions Loading and transportation up to 5 km Employer: VEC Engineering AD Read More
Reconstruction of former roadmen’s lodge – Chaira PSHPP Posted on Wednesday August 24th, 2016Saturday September 10th, 2016 by Koki Employer: VEC Engineering AD Read More
Retrofitting of a residential building with 24 apartments of Chaira PSHPP Posted on Wednesday August 24th, 2016Saturday September 10th, 2016 by Koki Scope of works: Laying of external heat insulation from extruded polystyrene Plastering and painting works Employer: NEK EAD, VEC Group Rila Read More