Construction of geo facilities against flood in Town of Nikopol, under the project Preventing the Risk of Floods from the Danube at Nikopol and Turnu Magurele – Prerequisite for Environmental Protection in the Border Region
Employer: Nikopol Municipality
Period of the contract: 2015 year.
Status: completed
Read More
Projects
Construction of specialized facilities for forest fire prevention
Construction of specialized facilities for forest fire prevention – watchtowers and artificial water sources under the project Municipal Forest Areas Fire Protection
Employer: Koprivshtitsa Municipality
Period of the contract: 2013 year.
Status: completed
Read More
Correction and cleaning the riverbed of Topolnitsa River near the Town of Koprivshtitsa
Correction and cleaning the riverbed of Topolnitsa River near the Town of Koprivshtitsa
Employer: Koprivshtitsa Municipality
Period of the contract: 2012 year.
Status: completed
Read More
Repair works of the Suhodol Dam 2
Repair works of the Suhodol Dam 2
Employer: Sofia Municipality
Period of the contract: 2012 year.
Status: completed
Read More
Activities to prevent flooding by correcting ravines passing through Elenovo Village
Activities to prevent flooding by correcting ravines passing through Elenovo Village
Employer: Blagoevgrad Municipality
Period of the contract: 2012 year.
Status: completed
Read More
Construction of the main building for Manastirska SHPP
Construction of the main building for Manastirska SHPP in the Village of Chuprene, Region of Vidin
Employer: STIS Ltd.
Period of the contract: 2010 year.
Status: completed
Read More
Kamenitsa HPP. Repair works on low-pressure pipeline
Kamenitsa HPP. Repair works on low-pressure pipeline
Employer: Bulgarian Joint-Stock Company Granitoid AD
Period of the contract: 2010 year.
Status: completed
Read More
Construction of water intake for Manastirska
Construction of water intake for Manastirska SHPP in the Village of Chuprene, Region of Vidin
Employer: STIS Ltd.
Period of the contract: 2009 year.
Status: completed
Read More
Construction of penstock for Manastirska
Construction of penstock for Manastirska SHPP in the Village of Chuprene, Region of Vidin
Employer: STIS Ltd.
Period of the contract: 2009 year.
Status: completed
Read More
Pastra Canal – repair
Pastra Canal - repair works from external and internal side in the section between the barrage on the Rilska River up to the settler, partial repair the walls of the settler and repair inside the intake basin of Pastra HPP
http://www.hylow.eu/
Employer: Bulgarian Joint-Stock Company Granitoid AD
Period of the contract: 2009 year.
Status: completed
Read More
Project HYLOW
HYLOW Project. Hydropower converters with very low head differences
Collaborative project under Seventh Framework Programme of the European Union
http://www.hylow.eu/
Employer: Commission of the European Communities
Period of the contract: 2008 year.
Status: completed
Read More
Rehabilitation of water intake structures, walls and bottom of the Petrohan Compensating Basin
Scope of works:
Cleaning the silts
Repair and strengthening the foundation of the compensating basin
Repair of the destroyed facing parts
Rehabilitation of the concrete and ferroconcrete constructions in the water intake and water infusing structures of the compensating basin
Employer: NEK EAD, VEC Group Rila
Read More
Repair of the Iskretski Canal from Petrohan Cascade km 0,000 to 17,194 – stage I
Scope of works:
Construction of service roads with stone chips
Installation of fiber glass pipes
Repair of water intake structures
Employer: NEK EAD, VEC Group Rila
Read More
Repair of the Iskretski Canal from Petrohan Cascade, km 0,000 to 17,194 – stage II
Scope of works:
Construction of a service road with stone chips along the route of the canal
Installation of fiber glass pipes
Repair of water intake structures
Employer: NEK EAD, VEC Group Rila
Read More
Construction of precast metal warehouse for temporary storage of Petrohan
Correction of Slatinska River in the section from Dr. Ivan Seliminski Str. To Sofia – Plovdiv railway line, refreshing of kilometers 1+000 to 1+300
Scope of works:
Excavation works
Formworks
Reinforcement
Concrete laying
Employer: Sofia Capital Municipality
Read More
Construction and assembly works of Srebarna Ginski Canal, part of Petrohan Cascade
Scope of works:
Construction of service roads with stone chips – 24 km
Excavation works
Formworks
Reinforcement works
Concrete works
Geotextile laying
Dismantling of old concrete pipes and installation of new fiber glass pipes
Filling works
Employer: NEK EAD, Dams and Cascades
Read More
Cleaning Zlatna Panega River in the corrected section 550 m from Lukovit Dam
Scope of works:
Excavating and removing the material deposited in the corrected areas using mechanization in difficult conditions
Loading and transportation up to 5 km
Employer: VEC Engineering AD
Read More
Reconstruction of former roadmen’s lodge – Chaira PSHPP
Retrofitting of a residential building with 24 apartments of Chaira PSHPP
Scope of works:
Laying of external heat insulation from extruded polystyrene
Plastering and painting works
Employer: NEK EAD, VEC Group Rila
Read More
Construction of settling basin in Iskretski Canal in front of water outlet and fortification of the drainage of the main Petrohan Compensating Basin
Scope of works:
Excavation works
Formworks
Construction and installation of reinforcement
Concrete works
Employer: NEK EAD, Dams and Cascades
Read More
Repair of the road Belmeken PSHPP – valve chamber, in the sections stricken by floods
Scope of works:
Restoration of culverts, destroyed by high water
Excavation works
Filling works
Formworks
Reinforcement works
Concrete works
Installation of concrete borders, elastic fence, laying of bituminous concrete, installation of pipes
Employer: NEK EAD
Read More
Repair of building used by Chaira PSHPP staff
Scope of works:
Laying of extruded polystyrene external heat insulation
Painting works
Repair of rooms, bathrooms and WC
Construction of new electric fittings
Construction of new roof
Employer: NEC EAD, VEC Group Rila
Read More
Fortification works on the Sestrimo – Chaira PSHPP road
Scope of works:
Excavations
Formworks, reinforcement and concrete works
Injection works
Employer: NEK EAD, VEC Group Rila
Read More
Sofia Metro Extension Project. Construction works. TBM Section
Renovation of the right wing wall of the energy dissipater of Topolnitsa Dam
Scope of construction works:
Restoring of completeness of concrete elements in the construction of the HPP drainage
Formworks
Reinforcement works
Concrete works
Installation of blocks with polymer structure
Drilling and injection works
Hydro installation of right wing wall and wall of HPP drainage
Employer: NEK EAD
Read More
Correction of river bed
Sorry, this entry is only available in Български.Обхват на извършените дейности:
изкопни работи
насипни работи
кофражни работи
армировъчни работи
бетонови работи
отводнителни канавки
дренаж
Период на сключване на договора:
юли 2008 г.
Статус:
Завършен
Read More
Implementation of capping beam for piles at sub-site Metro Station 7 Connection
Repair works of low pressure pipeline in the section from valve blade 1 (situated next to the reservoir of Kamenitsa HPP) to valve blade 2 (situated next to lower water chamber of Kamenitsa HPP)
Scope of works:
Dismantling of existing pipeline
Installation of new fiber glass pipes
Fortification and backfilling of pipeline
Cleaning the construction waste from the route
Employer: Bulgarian Joint-Stock Company Granitoid AD
Read More